Q1 If the USL is 6 and the LSL is

  

Q1

If the USL is 6 and the LSL is 3.5, find the Ppk when the process standard deviation is 1.2

choices are:

a) 0.735

b) 0.264

c) 1.292

d) 0.431 

This question deals with finding the Ppk, which is a performance index that accounts for processes that are not centered. Of the two calculations, we assign the smaller value to PpK. 

Given data are: the upper specification limit (6) and lower specification limit (3.5) for a process, the standard deviation (SD=1.2) of the process. To find the Ppk , we do two calculations:

Of the two calculations, we assign the smaller value to PpK. 

The two calculations are specified as follows:

1. Ppu=(USL- Xbar)/3* SD

2. Ppl =(X bar-LSL)/3*SD

The issue is that I am stuck in finding X bar, which is the mean of the process, to do the calculation. I need help in finding the X bar.

Is there any other formula for this type of problem?